Article 1 – Company Details
JG Equipment BV, established in Kralendijk, Bonaire, hereinafter referred to as the “Contractor”.
These terms and conditions apply to all quotations, agreements, deliveries, rentals, transport operations, and work performed by JG Equipment.

Article 2 – Applicability
2.1. These general terms and conditions form part of every agreement between the Contractor and the Client, as well as any subsequent agreements resulting from or related thereto, and apply to all quotations, offers, letters of intent, orders, order confirmations, and other documents and actions created and/or performed in preparation for, prior to, and/or in connection with an agreement.
2.2. No terms and conditions of any nature or designation whatsoever used and/or referred to by the Client shall apply, and all such terms and conditions are hereby expressly rejected by the Contractor.
2.3. In the event of a conflict between these general terms and conditions and the content of the agreement, the provisions of the agreement shall prevail.

Article 3 – Scope of Activities
3.1. The Contractor’s activities include, among other things, the rental of telehandlers, aerial work platforms, cranes, excavators, trucks, means of transport, and construction and demolition tools.
3.2. The Contractor is active in, but not limited to, transport operations, hoisting work, demolition work, earthworks, personnel rental, and other related activities.

Article 4 – Quotations
4.1. Quotations are non-binding unless stated otherwise.
4.2. Quotations are valid for 14 days.
4.3. Prices exclude ABB, permits, disposal fees, fuel, overtime, and other levies unless stated otherwise.
4.4. Obvious errors and mistakes are not binding on the contractor.

Article 5 – Formation of the agreement
5.1. An agreement is formed upon written confirmation or at the commencement of the work.
5.2. Verbal orders are binding as soon as the contractor has commenced performance.

Article 6 – Payment
6.1. Invoices must be paid within 8 calendar days of the invoice date.
6.2. Failure to pay on time places the client in default automatically.
6.3. Statutory commercial interest shall be charged from the due date.
6.4. All collection costs shall be borne by the client.
6.5. JG Equipment reserves the right to suspend work immediately.
6.6. JG Equipment may require prepayment or a security deposit.

Article 7 – Security deposit
7.1. A security deposit may be required for rented machines or tools.
7.2. The security deposit will only be refunded after inspection of the rented equipment.
7.3. Costs for damage, loss, and outstanding invoices may be deducted from the security deposit.

Article 8 – General rental terms
8.1. The rented equipment remains the property of the Contractor.
8.2. Subletting is prohibited without written consent.
8.3. The rented equipment may only be used for its intended purpose.
8.4. The Client must perform daily checks.
8.5. Any malfunctions must be reported immediately.
8.6. Rented machines may only be operated by qualified persons.

Article 9 – Rental of telehandlers, aerial work platforms, cranes, and excavators
9.1. The Client must ensure a stable and safe surface.
9.2. The Client is responsible for soil conditions and load-bearing capacity.
9.3. The Client is responsible for locating cables, pipelines, and underground utilities.
9.4. Damage caused by subsidence, sinking, or insufficient load-bearing capacity is at the Client’s expense.
9.5. Operating beyond the permitted capacity is prohibited.

Article 10 – Fuel and daily maintenance
10.1. Machines rented without an operator are supplied with fuel and must be returned with a comparable fuel level.
10.2. Missing fuel will be invoiced, including service charges.
10.3. Daily checks of oil, coolant, and lubrication points are the responsibility of the Client.

Article 11 – Damage and loss
11.1. The Client is fully liable for damage occurring during the rental period.
11.2. Theft, fire, vandalism, and loss are at the Client’s expense.
11.3. The Client remains liable for rental charges during repair or replacement.
11.4. All direct and indirect damage will be charged to the Client.

Article 12 – Transport
12.1. Transport is at the Client’s expense and risk.
12.2. The Client shall ensure unobstructed access to loading and unloading locations.
12.3. Waiting times will be invoiced at the applicable hourly rate.
12.4. Additional trips will be invoiced separately.

Article 13 – Lifting operations
13.1. The Client shall provide accurate information regarding weight, dimensions, and center of gravity.
13.2. The Client shall ensure a safe working area.
13.3. The Contractor may halt operations if safety is not sufficiently guaranteed.
13.4. Delays resulting from weather conditions are at the Client’s expense.

Article 14 – Demolition Work
14.1. The Client must provide all available information regarding structures.
14.2. Asbestos, contamination, or other hazardous substances must be reported in writing in advance.
14.3. Risks that have not been reported are entirely at the Client’s expense.
14.4. Hidden structures or unexpected circumstances constitute additional work.

Article 15 – Earthworks
15.1. The Client warrants the accuracy of the data provided regarding soil conditions.
15.2. Damage to unreported cables, pipes, tanks, or foundations is at the Client’s expense.
15.3. Any remediation costs are at the Client’s expense.

Article 16 – Additional Work
16.1. All work falling outside the scope of the original assignment is considered additional work.
16.2. Additional work is performed at the applicable rates.
16.3. Additional work ordered verbally may be invoiced.

Article 17 – Minimum Charges
17.1. Machines with an operator are charged on an hourly basis.
17.2. Machines without an operator are charged on a daily basis.
17.3. Transport is charged for a minimum of 1 hour; after the first hour, charges apply per half-hour.
17.4. Downtime caused by circumstances beyond JG Equipment’s control remains fully billable.

Article 18 – Surcharges for Work Outside Regular Working Hours
18.1. The Contractor’s regular working hours are Monday through Friday, 07:00 to 16:00.
18.2. For work performed outside these hours, the following fixed surcharges apply to the total hourly
rate:
– Overtime after 16:00 and weekends: standard rate + 20%
– National public holidays: standard rate + 40%
– The minimum billable duration outside regular working hours is 4 hours per call-out.

Article 19 – Weather conditions
19.1. Work interruptions caused by rain, storms, thunderstorms, extreme heat, or other weather conditions do not entitle the Client to compensation.
19.2. Scheduled deployments remain billable if personnel and equipment were available.

Article 20 – Force majeure
20.1. Force majeure includes, among other things, storms, hurricanes, extreme rainfall, technical failures, strikes, government measures, import and supply problems, and staff illness.
20.2. Obligations are suspended during a period of force majeure.

Article 21 – Liability
21.1. Any liability on the part of the Contractor is limited to the invoice amount for the relevant assignment.
21.2. If insurance provides coverage, liability is limited to the amount paid out.
21.3. The Contractor is never liable for consequential damage, loss of profit, loss of revenue, damage due to business interruption, business losses, contractual penalties imposed by third parties, or indirect
damage.
21.4. The Client indemnifies the Contractor against claims by third parties.
21.5. The Contractor is not liable for damage to or loss of goods stored with the Contractor if such damage or loss is the result of force majeure or circumstances beyond the Contractor’s control, including but not limited to: vandalism, theft, burglary, fire, lightning strikes, water damage, and extreme weather conditions.
21.6. The exclusions and limitations of liability set out in this article do not apply if the damage is the result of willful misconduct or deliberate recklessness on the part of the Contractor or its personnel.
21.7. Should the Contractor nevertheless be held liable for damage to or loss of the stored goods, such liability is at all times limited to the amount paid out by the Contractor’s liability insurance in the relevant case, plus the applicable deductible.
21.8. The Client is personally responsible for adequately insuring the goods during the storage period against risks such as fire, theft, and water damage.

Article 22 – Insurance
22.1. The Client must ensure adequate insurance coverage.
22.2. Proof of insurance must be submitted upon request.
22.3. The absence of insurance does not release the client from liability.

Article 23 – Cancellation
23.1. Cancellation more than 48 hours before the start: free of charge.
23.2. Cancellation within 48 hours: 50% of the agreed price.
23.3. Cancellation within 24 hours: 100% of the agreed price.
23.4. Costs already incurred will always be charged in full.

Article 24 – Retention of title
24.1. All goods supplied remain the property of the contractor until full payment has been made.
24.2. The contractor may reclaim goods if payment is not made.

Article 25 – Disputes
25.1. The law of Bonaire, Sint Eustatius, and Saba applies to all agreements.
25.2. Disputes shall be submitted to the competent court in Bonaire.

Article 26 – Final provision
26.1. If one or more provisions in these general terms and conditions are or become void or voidable, in whole or in part, at any time, the remaining provisions of these general terms and conditions shall remain fully applicable.

U huurt de benodigde machines en gereedschappen wanneer u ze nodig heeft

Informeer naar de vele mogelijkheden voor uw projecten